Description
Snapshot during the construction of the Simplon Tunnel - the electric cables are being brought into the tunnel
they call them #photosphore with their beautiful #playoflight
this unobtainable #advertisingsign comes from Antwerp and is paired with the one already published today from '63
#original #vintage with the #santacocacola on one side and the classic #cocacolabutton on the other
Pattini ghiaccio Spaten brau Snapshot during the construction ofgood evening with these #antique #iceskates 45cm long complete with blades and #leatherbelts; gorgeous hanging in a #mountainfurniture context.
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy






















![FWE - 120V 3/4 Height Non-Insulated Mobile Heated Cabinet with 10 Pan Capacity - ETC-UA-10HD (Special Order 4-6 weeks) [type]Baltic](https://cdn.shopify.com/s/files/1/0709/1417/9362/files/FWE-120V-34-Height-Non-Insulated-Mobile-Heated-Cabinet-with-10-Pan-Capacity-ETC-UA-10HD-Special-Order-4-6-weeks.webp?v=1746199075)

